Process · One Project. One Process.

One project,
one flow

From initial requirements through design, content, production, inspection and on-site delivery. No stage stands alone; each follows one project standard. A typical project runs from requirements to final light-up including an average 50-day production period, with timing depending on form and scale.

  1. 01

    Requirements

  2. 02

    Form & structure design

  3. 03

    Content design

  4. 04

    Production

  5. 05

    Inspection & export

  6. 06

    Installation & support

Project review pin-up wall from sketch to completion

Workflow

From sketch to light-up,
one standard

Six Steps

How a project
moves forward

A drawing, a site photo or just the form you have in mind is enough to start. The deliverables of each step become the standard for the next.

Start with step 01
  1. 01 Requirements Requirements

    Installation environment, viewing distance, ambient light and content type are confirmed. A drawing, a site photo or the form you have in mind is enough to start.

    • CheckedIndoor or outdoor, viewing distance, ambient light, operating hours
    • From youArchitectural drawings · site photos · reference images
    • DeliverableInitial proposal — form · pitch · expected configuration
  2. 02 Form & Structure Form & structure design

    Starting from site survey and 3D review, curvature, split lines, frame exposure and finish details are matched to the architectural drawings. Distortion and brightness are reviewed per viewing angle and the pitch is fixed.

    • ScopeScreen form · cabinet layout · support structure
    • ReviewViewing-angle simulation along the main routes
    • DeliverablesCabinet layout · support structure · power and signal schematics · assembly drawings
  3. 03 Content Content design

    Pixel maps and distortion-correction values are built from the real form and pixel structure of the screen. Screen-specific content is produced, or existing assets re-edited.

    • MappingForm-based pixel map · distortion-correction profile
    • ProductionIn-house · studio co-production · re-edited client assets
    • DeliverablesPlayback content · playback system configuration
  4. 04 Production Production

    A manufacturing partner matched to the product line and technical requirements produces to Mimolux specifications and process standards. Assembly, process and calibration are checked during production.

    • MaterialsLED, power supply and receiving-card grades specified by Mimolux
    • ControlCabinet tolerances · module assembly · full-assembly inspection
    • Lead timeAverage 50 days (varies with form and scale)
  5. 05 Inspection & Export Inspection & export

    The whole screen or its key sections are pre-assembled for light-up, 72-hour burn-in, calibration and full pixel inspection. Nothing ships without Mimolux approval.

    • InspectionMaterials · burn-in · calibration · pixels · packing
    • ExportExport crates · moisture protection · C/O · invoice · packing list
    • ShippingSea or air / FOB · CIF · DDP · spare parts shipped together
  6. 06 Installation & Support Installation & support

    On-site installation or installation support, final light-up, operator training and remote support close the project. Measurements are recorded per project so re-orders are produced to the same standard.

    • On siteInstallation data · technical documents · installation support
    • HandoverFinal light-up · operator training · playback system handover
    • SupportRemote support · spare parts · project records kept

From Design to Reality.

Built on site,
exactly as designed

A display project is complete not when the product ships, but when the intended screen is realised on site.

Full pre-assembly of a curved screen before shipment01 · Pre-assemblyFull pre-assemblyAssembled close to the installed state to check structure, fixings and picture quality.
Solid-colour test pattern and colour measurement before shipment02 · System ValidationSystem validationLight-up, calibration, pixel condition, signal and power configuration verified before shipment.
LED facade installation on site03 · Site CoordinationSite coordinationDesign drawings and installation data matched to site conditions, with the technical documents the site needs.
Facade LED cabinets installed from an aerial work platform04 · InstallationInstallationOn-site installation or installation support.
Final light-up and handover of a large lobby LED wall05 · CommissioningLight-up · handoverFinal light-up, operator training and remote support close the project.

Start with Step 01

Your requirements
are enough to start.

Environment, viewing distance, the form you have in mind. Drawings or site photos make the proposal more precise.